We were hired to re-pipe this poorly installed Dunkirk steam boiler. Forget the poor choice in header material. The original design was just completely wrong. We re-piped with a drop header and then Mark insulated the piping as part of a bigger insulation job. (he had us insulate the entire system that was visible.)