We replaced an old boiler with this Burnham steamer. The old boiler was piped wrong. We installed a low fire gas valve to allow for both high and low firing rates. This is just the second time that we installed the Pajek Electronic Pressure Controller on a customers boiler. The system is a one pipe system.