Utilize the links to view the pictures. We are contracted by Emery Remodeling to do the plumbing work for this master bathroom remodel they are undertaking. Its a complete gut out and remodel. We put in cast iron drain pipes (spec'd out by the architect) to minimize noise. We installed acoustic insulators on the water pipes since it was apparent that noise was an important factor. The carpenters then did their thing and installed the sub floor and partition walls. The room is heated by radiant in floor tubing. We installed two loops of tubing. One for the toilet area and the shower seat. The other for the shower floor and main bathroom area. We completed the set and finish of fixtures and the finished product is just wonderful!