This guest bathroom is being redone at the same time as the master bathroom. The room had a radiator that was removed, and now the room will be heated by radiant floor heat. The tubing is a single loop of 1/2'' tube and is also installed under the area the tub will sit in order to keep the cast iron warm. The flooring contractor poured Ardex down to imbed the tubes and provide a level surface.